Program design
Two wrap-ups quoted on the same project can come back thousands of dollars apart and cover meaningfully different things. The gap is almost always in four design decisions that get made early and quietly.
New to the structure? Start with wrap-up insurance and come back here.
How long the program runs, including the completed operations tail. How the covered location is described, and what happens to work done outside it. Whether one program covers one project or several. And who is excluded from enrolment, which decides who still has to hand you a certificate.
Each of these is negotiable at quote and expensive to change later. Each one has its own page below.
None of them is a technicality. Every one of them has been the deciding fact in a claim somebody lost.
The decisions
Two wrap-up proposals on the same project can arrive thousands of dollars apart and cover meaningfully different things. Comparing them on premium and headline limit will not tell you which is better. The differences are in the design, and four decisions account for most of them.
| Decision | The question | What it changes |
|---|---|---|
| Policy term | How long does coverage run, during construction and after it | Most of the premium on residential work. Whether a claim filed in year nine finds a policy at all |
| Covered locations | Where does the coverage apply | Whether fabrication, staging, transit and off-site tie-ins are inside or outside the program |
| Multiple projects | One program for one project, or several | Whether a loss on one job can erode the limits available to another |
| Exclusions | Who and what is left out | Who still has to produce a certificate, and where the uninsured gaps sit |
Each is negotiable while the program is being marketed and expensive or impossible to change later. Each one has its own page.
The wider frame
When construction insurance gets negotiated, the conversation often collapses into a single question: what is the premium? Premium is one tool among several. An underwriter is deciding whether to take the risk, how much of it, on what terms and at what price, and there are levers for each of those.
So when an underwriter is uncomfortable with something, the better question is usually not whether the premium can come down. It is what is driving the concern, and which of these tools could change to make the risk work. That conversation produces a different result.
Reading a proposal
Put two wrap-up proposals side by side and the first things visible are the premium and the limit. Those are the two least informative numbers in the document. The questions that actually decide which program is better:
A proposal that answers all nine is worth more than a cheaper one that answers four, and the difference usually only becomes visible at the worst possible time.
The other half
Program design is only half the job. The construction contracts are the other half, and they are usually drafted by people who are not in the insurance conversation.
If a subcontract requires a trade to indemnify the general contractor for obligations wider than the wrap covers, that trade carries uninsured exposure and almost certainly does not know it. If the subcontract requires insurance the wrap already provides, the project may be paying twice. If the subcontract is silent about who bears the retention, that gets decided after the loss, expensively.
In California part of this is settled by statute. Civil Code 2782.9 makes contractual indemnity unenforceable for claims a residential wrap covers, and sets conditions on charging participants for the retention. Civil Code 2782.95 requires the program terms and the bid credit to be disclosed in the contract documents. The California rules page sets out both.
Everywhere else it is settled by drafting. The practical rule is that the insurance program and the contract documents should be designed together, at the same time, rather than in sequence by two departments who do not read each other's work.
Questions
The policy term, specifically the completed operations extension. It has to be bought when the program is placed, it cannot be added after the program closes, and on residential work it accounts for most of the premium. A program with too short a tail looks cheap and may find no policy in force when the claim arrives.
Because the limit is shaped by everything around it: sublimits on particular exposures, whether defense costs erode the limit, whether the limit is dedicated to this project or shared, and the exclusions and conditions attached. A ten million dollar policy with a one million dollar sublimit on the exposure that causes the loss is a one million dollar policy that day.
Outside, where the budget allows. On a construction defect claim with twenty trades and expert reports on both sides, defense can consume a substantial part of the tower before any damages are paid. Ask for both versions to be quoted so the difference is visible.
A recommendation is something the underwriter would like done. A condition is something the policy makes a requirement of coverage. Fencing, lighting, water detection, hot work procedures and site inspections can appear as either. After a loss the distinction decides whether the claim is paid, so it is worth checking which one each item is and making someone responsible for it.
Some of it. Adding insureds, adjusting values and extending a construction term that has run long are normally possible, at a price and sometimes subject to fresh underwriting. Adding years of completed operations after the program has closed generally is not. The decisions with the least flexibility are the ones worth the most attention before binding.
The broker, whoever is drafting the construction contracts, and whoever will administer the program day to day. Designing the insurance without the contracts, or without the person who will have to run enrollment and certificate collection, is where most of the expensive gaps come from.
Next
These four pages go through each decision in turn.
Who you would be working with
Managing Director · ISU Insurance Services of San Francisco
Cary handles the wrap-up placements here. He has spent 38 years in construction insurance. The first ten were on the carrier side, underwriting builders’ risk and complex property exposures. The 28 since have been in retail brokerage, advising residential developers, general contractors and other construction clients on project-specific and annual programs.
He is also one of the original authors of the project liability application that much of the industry still uses to submit wrap-ups to carriers. In practice that means he knows what each question is actually asking for, and where a thin answer will cost you at quote.
Pricing
Tell us about the project and we will give you a straight answer on whether a wrap makes sense for it. If it does not, we will say so, and then we will price the structure that does. That answer is worth more to you than a placement that costs more than it saves. There is no project minimum to ask. This goes straight to Cary White, who handles wrap-up placements for our construction clients.