Structure

Wrap-up insurance

A wrap-up is one insurance program bought for one construction project that covers everybody working on it. The alternative is every contractor bringing its own policy and hoping the certificates line up. Both are normal. Which one is right depends on the job.

Wrap-up is the umbrella term. The two common shapes are the OCIP, bought by the owner, and the CCIP, bought by the general contractor.

The short version

One program, one site, everybody on it

A wrap-up provides general liability, excess liability and in most cases workers' compensation for the sponsor, the general contractor and every enrolled subcontractor, for work performed at the designated project site.

Enrolled trades take their own insurance cost out of their bid, because the program is covering them instead. The sponsor pays one premium and gets one set of limits, one carrier and one claims file.

It is not free coverage and it is not automatically cheaper. It is a different way of buying the same protection, and whether it saves money depends on the project.

What we place, and where
Programs
Owner-controlled (OCIP) and contractor-controlled (CCIP) wrap-ups, rolling wrap-ups, builders risk, and project-specific or practice liability where a wrap is not the right structure.
Project types
Multifamily and mixed-use, condominium and for-sale residential, podium and wood-frame, commercial, tenant improvement, and industrial.
Where
Licensed in all 50 states. Deepest bench in California, where the wrap-up statutes are covered in detail on this site.
Project size
No minimum to ask. A wrap typically starts to pay for itself around $25 million in hard construction value. Smaller projects are placed on conventional structures instead.
Who we work with
Owners, developers, general contractors, and subcontractors buying practice coverage for the off-site gap.
Who you deal with
Cary W. White, producer. ISU Insurance Services of San Francisco, CA Lic. #0778092. Cary W. White, CA Lic. #0B77854. We place coverage; we are not the carrier.

The structure

What a wrap-up actually is

A wrap-up is often described as a way to insure everyone on a construction project under one program. That is true and it is incomplete. A wrap-up that works is a combination of insurance, contract administration, risk allocation, claims strategy and financial controls, and the insurance is only the part you can hold in your hand.

Under a conventional structure the owner, the general contractor, the subcontractors and the lower tier subs each bring their own liability insurance to the job. On paper that looks adequate. In practice the policies do not fit together nearly as well as everyone assumes. One contractor has a residential exclusion. Another has a subsidence restriction. A third carries lower limits, or a different completed operations provision, or a deductible nobody has read.

Then a claim happens. Instead of one program responding to the project, several carriers get involved, each working out whose work caused the damage, whose policy applies, whether an additional insured endorsement responds, whether contractual indemnity applies, and who pays what share of the defense. That argument is the problem a wrap-up is trying to solve.

Varieties

The shapes a wrap-up comes in

Wrap-up is the umbrella term. Underneath it there are three arrangements that come up regularly.

Three common wrap-up arrangements
NameWho buys itCoversTypically used when
OCIP
Owner-controlled
The project owner or developerOwner, general contractor, enrolled subcontractorsThe owner wants control of the limits and the claims, and will still exist when the tail runs
CCIP
Contractor-controlled
The general contractorGeneral contractor, enrolled subcontractors, usually the owner as an additional insuredThe contractor has the buying power and the administration, or the owner does not want the program on its books
Rolling wrapEither, usually a repeat builderMultiple projects added over time under agreed eligibility criteriaA pipeline of similar projects, where arranging a new program for each one is not practical

The owner-controlled and contractor-controlled versions are the same machinery with a different name on the policy, and the choice between them has real consequences for who holds the retention, who controls the defense and whose balance sheet backs the tail. The OCIP versus CCIP page compares them line by line. The rolling version introduces a shared limit question that the single project version does not have, covered on the multiple projects page.

Scope

What is in it, and what is not

A typical wrap-up provides general liability and excess liability, and in most cases workers’ compensation and employers liability, for work performed at the designated project site. Builders risk is a separate placement that often sits alongside it rather than inside it.

What a wrap-up does not do is make a contractor’s own insurance irrelevant. Enrollment covers the enrolled party for its operations at the site. Everything else remains the contractor’s own problem:

The excluded parties list is its own subject. Suppliers who only deliver, haulers, design professionals and hazardous material contractors are commonly left out, and every one of them still has to produce a certificate. That is covered on the exclusions page.

Money

How the money actually moves

The most important financial rule in a wrap is that the project should not pay for the same insurance twice.

Subcontractors price insurance into their bids. If the wrap is going to provide the project liability coverage, that cost has to come out of the bids, and there has to be a defensible method for taking it out. There are three common ones. Insurance cost is deducted from the bid after the fact. The contractor provides a stated bid credit. Or the work is priced net of the insurance being provided, from the start.

Whichever method is used, it has to be defined before bids are finalized. If it is not, the argument arrives later, about whether the cost really came out and whether the expected saving was ever achieved. In California that argument has a statutory answer: under Civil Code 2782.95, a credit not disclosed before the bid leaves the bidder free of its bid. The California rules page sets out what has to be disclosed and when.

On the sponsor’s side the premium is normally rated against hard construction value for the liability lines and against payroll for workers’ compensation, with a premium audit at the end. The variables that move the number most are the length of the completed operations tail, the size of the retention, whether limits are dedicated to the project, and whether defense costs erode the limit.

A wrap is not automatically cheaper

It can be, at scale, because limits are bought once at project level instead of thirty times inside subcontract bids. But the saving is a result, not a feature. On a project that is too small, or where the trades could insure the work perfectly well themselves, the administration costs more than the structure returns.

Running it

Administration is part of the program

A wrap-up does not remove complexity from a project. It moves the complexity to a different place. Instead of asking whether every subcontractor has the right insurance, the project team has to answer a different set of questions, continuously, for the life of the program:

That last one deserves saying plainly. If the subcontract requires a trade to indemnify the general contractor for obligations wider than the wrap covers, the trade has uninsured exposure and does not know it. The construction contracts and the insurance program have to be designed together, not in sequence by two different departments.

The decision

Whether this project should have one

The question is not whether this project should have an OCIP or a CCIP. The better question is which insurance structure gives this particular project the most reliable protection, the clearest allocation of responsibility and the fewest gaps when a serious claim arrives.

Sometimes the answer is a wrap-up. Sometimes it is a project-specific liability policy covering the owner and the general contractor, with the trades keeping their own insurance. Sometimes conventional contractor insurance with well drafted requirements is entirely appropriate. The mistake is assuming one structure is better because it is the familiar one.

Insurance should follow the project. The project should not be redesigned around the limitations of the insurance.

As a rough marker, a wrap tends to start paying for itself somewhere around twenty-five million dollars in hard construction value, earlier on residential where the coverage gap is real and later on commercial where it usually is not. That is a rule of thumb and nothing more. There is no minimum to ask, and a good share of the projects we price end up placed on a conventional structure instead.

Questions

Common questions

What is the difference between a wrap-up, an OCIP and a CCIP?

Wrap-up is the general term for a consolidated insurance program covering a construction project. An OCIP is a wrap-up bought and controlled by the owner. A CCIP is the same structure bought and controlled by the general contractor. A rolling wrap-up is one program that multiple projects are added to over time.

What does a wrap-up cover?

Typically general liability and excess liability, and in most cases workers' compensation and employers liability, for the sponsor, the general contractor and enrolled subcontractors, for work performed at the designated project site. Builders risk is usually placed alongside it rather than inside it.

Do enrolled subcontractors still need their own insurance?

Yes. The wrap covers them for their work at the project site. They still need their own policies for every other job, for automobile liability, for professional and pollution exposure where relevant, for their tools and equipment, and for anything the program excludes or anything done off the covered location.

Is a wrap-up cheaper than everyone buying their own insurance?

Sometimes, at scale. The saving comes from buying limits once at project level instead of paying for them inside every subcontract bid, and it only appears if the insurance cost is genuinely removed from those bids. On smaller projects the administration cost outweighs it.

How is the insurance cost taken out of subcontractor bids?

Three common methods: deducting the insurance cost from the bid, taking a stated bid credit from the contractor, or having the work priced net of the wrap coverage from the start. The method has to be defined before bids are finalized. In California it has to be disclosed before the bid or the bidder is not legally bound by it.

How long does a wrap-up stay in force?

There is a construction term that runs while the job is being built and a completed operations extension that runs for years afterwards. The length of the extension should match the repose period in the state the project is in, and it has to be bought when the program is placed.

Who administers the program?

Somebody has to, for the whole life of the program. Enrollment, certificate collection from excluded parties, payroll and contract value reporting, claims centralization, deductible allocation, premium audits, and keeping completed operations coverage intact long after construction ends. A wrap-up nobody runs is worse than no wrap-up, because everyone on the job believes they are covered.

What size project justifies a wrap-up?

A wrap typically starts to pay for itself around twenty-five million dollars in hard construction value, earlier on residential work where subcontractors often cannot buy the coverage at all. It is a rule of thumb rather than a threshold, and there is no minimum to ask. Projects below it are usually placed on conventional structures instead.

Next

Where to go from here

Wrap-up covers a family of structures. The next question is usually which one, and for what kind of project.

Who you would be working with

Cary W. White

Cary W. White, Managing Director, ISU Insurance Services of San Francisco

Managing Director · ISU Insurance Services of San Francisco

Cary handles the wrap-up placements here. He has spent 38 years in construction insurance. The first ten were on the carrier side, underwriting builders’ risk and complex property exposures. The 28 since have been in retail brokerage, advising residential developers, general contractors and other construction clients on project-specific and annual programs.

He is also one of the original authors of the project liability application that much of the industry still uses to submit wrap-ups to carriers. In practice that means he knows what each question is actually asking for, and where a thin answer will cost you at quote.

cwhite@isusf.com · 415-613-5589

Pricing

Price your project

Tell us about the project and we will give you a straight answer on whether a wrap makes sense for it. If it does not, we will say so, and then we will price the structure that does. That answer is worth more to you than a placement that costs more than it saves. There is no project minimum to ask. This goes straight to Cary White, who handles wrap-up placements for our construction clients.

The project
Structure and exposure
You

We will come back with a price range and what else underwriters will need. No obligation, and we will tell you if a wrap is the wrong answer.